Peter, our Rear Commodore, who has a ton of leadership ability and energy, worked with me the first half, replaced by Phillip, our Race Chairman and Jill at around 4:30. In these shows we always have more than one person at our booth so everyone an get relief periods to eat and explore the show a bit. PC Art was working on the other side of the hall, selling power yachts, but came over to say hello, and Bill, our Board Member responsible for the Restaurant and Bar, helped for a while too.
Bill, me, Jill and Phillip at the booth.
And while there was a long line of folks waiting to be let in at noon, the crowd had thinned so I was released at 8 p.m.
One of the only two things I did for ILENE at the show was to figure out how to send our EPIRB out for a battery replacement, after five years in readiness - which I call use. This being the toy that alerts the Coast Guard to come rescue us, we are fortunate not to have actually "used" it. And its the kind of thing you want to have a nice strong battery, in case. I have to send it off in time to get it back before we leave for Nova Scotia in June. The other thing was to contract for the installation of a faux teak deck to be measured, cut and installed on the swim platform. This area is quite small and rather ratty looking and I figured out how to install it by removing the folding retractable swim ladder and reinstalling it atop the new decking.
The reasons for only one day of boat work during this period were first that my back had gone out a bit and second that winter has indeed finally arrived in New York. But the one warm day I worked with mechanic Ed, for six hours. Thats twelve man hours. The results: both it ILENEs two large "primary" winches were disassembled, all parts had all old grease scraped off and then scrubbed with a toothbrush in a bucket with paint thinner to get what couldnt be scraped. Once clean, the parts were dried, regreased and reassembled. The book says this should be done annually! After 17 years, the last five with heavy use, these workhorses were overdue for the TLC they got. The other two winches that Im going to do are those on the coach roof. (I dont think I have to do the fifth winch, the one on the mast, because it gets so very little use.) The next two are smaller and with the benefit of our learning curve, should not take as long. Having learned a lot from watching Ed, Im thinking of trying to do these myself, taking off the parts and cleaning them in an indoor location. Then will come the steering and some electrical work, with Ed.
And here is a picture of ILENEs mate, just cause I like looking at her.
0 comments:
Post a Comment